Company
Service
Showcase
Candidate
Contact
Items of construction → For drainage project
25 tons water tanks
25 tons water tanks attach the galvanized iron lad
Compression pump pump
Sewage flowmeter
The sewage flowmeter attaches the control box
Upper air tubing work
The upper air tubing work wears the safety belt 1
The upper air tubing work wears the safety belt 2
The upper air tubing work wears the safety belt
Draining water tubing
Drain line
Roof water tank
Between pipeline pipeline disposition
Roof exhaust pipe
Roof water tank service pipe disposition
PVC 600mm replaces the R.C. indoor well pipeline e
The sewage pipe links sewage indoor well PVC 600mm
Septic tank and sewage indoor well connection cons
Service
Items of construction
High pressure unit project
Low pressure power equipment project
The pipeline commutation equipment installs the project
Lighting attachment project
Telecommunication equipment project
For drainage project
Protects the bath facilities engineering
Fire fighting equipment project
Air-conditioning plant project
Pressure resistance antiknock device project
Airtight trunking facilities engineering
Service of consultant
Electrical person in charge license
Electrical diagnosis energy analysis
Electrical equipment periodic inspection
The electricity preserves the flaw detection
Automatic control design construction
24 hour mobile service
Copyright © 2008 NAN I INDUSTRIAL ENGINEERING CO., LTD. All Rights Reserved.
Designed by:
Everywhere